The Car Park screening system was subject to planning approval for the Scottish Areas. The system is supported from Stainless Steel First fix Plates at 600mm from structure projection. The Installation provided a challenge due to raked floors for the ramp Areas.
The Striking Red provided in High Gloss provides a focal point as all four sides are surrounded by other building in close proximity.
Each aerofoil section was individually installed with laser profiled end plates for closure of the section. The installation of this project was Programmed for 4 weeks of which we completed in 6 days from MEWP.
The installations visible to all four sides of the structure were supported on vertical rafter sections from the SolLine Rage of which carried the aerofoil sections on multiple centres.
Product: SolLine Lunar 200
Rafter: SolLine Range
First Fix: LouvreSol Flitch
Finish: PPC RAL 3020
|
|
|
| |
|
|
|
|
|
|
|
|